Cqi-27 Casting System Assessment Xls -

Like its siblings (CQI-9 for Heat Treat or CQI-11 for Plating), CQI-27 is designed to provide a proactive approach to casting. It focuses on: Process controls Testing and equipment maintenance Continuous improvement Reduction of waste and defects Who needs it?

More detailed requirements for process documentation and training. Conclusion

Scheduled upkeep of furnaces, dies, and molding lines. cqi-27 casting system assessment xls

Physical verification of a specific part being processed. Generated Sample: Process Table Section (Excel Format)

Use the XLS tool to aggregate the results. Analyze any "Non-Conforming" findings to identify systemic weaknesses in the casting control system rather than treating them as isolated incidents. Phase 4: Corrective Action and Closure Like its siblings (CQI-9 for Heat Treat or

CQI-27 is comprehensive. Some auditors mark “N/A” to skip difficult sections (e.g., metallographic testing). Your XLS should have a verification rule (e.g., a pop-up comment) that says “N/A requires written justification.”

If an automated formula triggers a failing section score, immediately pivot to the Action Plan section of the spreadsheet to assign owners and target completion dates for corrective actions. Conclusion Scheduled upkeep of furnaces, dies, and molding

Caution: Without a deep understanding of CQI-27 clauses, self-built sheets often miss critical requirements like “lift truck furnace charging safety interlocks.”

Strict adherence to the control plan. If the plan says the melt must be 720°C, there must be data proving it stayed within that range.